Hilliard St. between Woodland and 5th Line and 5th Line to Chemong Rd are being re-paved. The tarmac has been removed and the surface today was gravel. Where the tires have smoothed out the gravel, it’s not bad for bikes but the margins of the road are loose and a little treacherous.